<
>
Size: 37,000 sq ft of 105,900 sq ft facility
Location: Katy, Texas
Services: Architectural Design, Construction Management, Master Planning
This campus facility has a laboratory wing which includes Newpark Drilling Fluids’ field services mud labs, its DSC drilling fluid injection simulator, pilot plant, QA/QC labs and other analytical and research capabilities. This project was completed in 2013.
NEWPARK
Laboratory
"No man ever steps in the same river twice." ~Heraclitus